ADUscale
Feasibility Report · Sample

ADU Feasibility Report

20301 Baltar St, Winnetka, CA 91306, USA
ADU Allowed Likely

Property Overview

20301 Baltar St, Winnetka, CA 91306, USA
APN
2107-003-026
Owner
GOMEZ, ALFREDO F TR ALFREDO F GOMEZ TRUST
Lot Size
8,848 sqft
Year Built
1954
Zoning
RS-1
Land Use
0101

Zoning Information

Zone Name:Suburban
Zone Type:Overlay

Zone Guide

The purpose of the Mobile home Park Zone is to encourage the provision of affordable housing in the City as provided in the Housing Element of the General Plan, by permitting both the retention and expansion of existing mobile home parks and the establishment of new mobile home parks. The purpose of the CPIO District is to provide for supplemental development regulations tailored to each Community Plan area to ensure that development enhances the unique architectural, environmental, and cultural qualities of each Community Plan area, integrates improvements and enhancements to the public right-of-way, and maintains compatible land uses, scale, intensity, and density.

Development Standards

Max Height:N/A
Max FAR:N/A
Min Lot Size:7500 sqft
Min Lot Width:60 ft
Min Front Yard:N/A
Min Rear Yard:20 ft

Other Requirements

NA

ADU Types Analysis

Junior ADU (JADU)
Allowed

Up to 500 sqft within primary dwelling

Max 500 sqft
Detached ADU (By-Right)
Allowed

State-guaranteed 800 sqft minimum

Max 800 sqftMax 18 ft height4 ft setback
Detached ADU (New)
Allowed

New detached construction up to 1,200 sqft

Max 1,200 sqftMax 18 ft height4 ft setback
Attached ADU
Allowed

Attached to primary dwelling

4 ft setbackMax 50% of primary
Garage/Structure Conversion
Allowed

Convert existing accessory structure

0 ft setback
Multifamily Internal
Not Allowed

Within existing MF non-residential space

Multifamily Detached
Not Allowed

Up to 2 detached ADUs on MF lot

Risk Assessment

High
HighHigh Construction Cost

ADU construction typically costs $150K–$500K+, a significant capital commitment.

→ Get 3+ contractor bids. Prefab options may cut costs by 20–30%.

Medium
MediumMissing Parcel Geometry

Parcel boundaries unavailable — setback compliance not fully confirmed.

→ Obtain a survey or confirm boundaries via the county assessor.

MediumFew Nearby ADU Permits

Fewer than 3 ADUs with Certificate of Occupancy found nearby.

→ Check with the local building department for recent approvals.

MediumFire Hazard Data Unavailable

Fire hazard severity zone data was not available for this parcel.

→ Verify fire zone status via CAL FIRE or the city planning portal.

MediumMissing Building Footprint

Building footprint unavailable — lot coverage calculations are estimated.

→ Provide accurate building dimensions to refine the feasibility analysis.

Low
LowUtility Connection Costs

Utility upgrades (electrical, sewer) may add $5K–$20K to project costs.

→ Have a contractor assess existing utility capacity before budgeting.

Coastal Zone

Property is outside the Coastal Zone

Nearby Permits (20)

Map of nearby permits
ADU Permit
Attached ADU

Eplan Conversion Of An Existing Attached Garage To A New Adu Per Ord

2022-09-08
CofO Issued
ADU Permit
Detached ADU

New 1-Story Detached Accessory Dwelling Unit (798 SF) In Rear Yard

2023-03-14
CofO Issued
ADU Permit
Garage/Structure Conversion

Convert Existing 400 SF Detached Garage To An Accessory Dwelling Unit

2021-11-02
CofO Issued
ADU Permit
Junior ADU (JADU)

Junior Accessory Dwelling Unit Within Existing Single-Family Dwelling

2023-07-21
Permit Issued
ADU Permit
Detached ADU

New Detached Accessory Dwelling Unit, 1,000 SF, 2 Bed / 1 Bath

2024-01-09
Under Review

Construction Cost & ROI Estimate

Slope
Finish
Contingency
Bedrooms

Construction cost
Monthly rent
ROI
Cost Breakdown
Base construction
Finish
Contingency
Soft costs
Total (low estimate)
NOI & Returns
Gross annual income
Vacancy loss
Effective gross income
Property tax
Insurance
Maintenance
Management
Reserves
Total expenses
NOI
Value uplift

Sample feasibility report. Figures are estimates for illustration; verify with a licensed contractor and your local building department before budgeting.

ADU Feasibility Result